News

September 2024

PVPC-LW pumps with constant power, the FASTEST DELIVERY TIME in the market!

The delivery time for PVPC-LW axial piston pumps is now 6/8 weeks! The delivery time of mechanical pumps with constant power control was 12/14 weeks, since each pump must be calibrated according to the characteristics of the customer electrical motor.


The halving of the delivery times is the result of a long production process optimization, further improving Atos' lean manufacturing plan.


A further step forward to the industrial revolution that is re-shaping Atos into a next-generation SMART FACTORY in less than two years!


Discover PVPC pumps at www.atos.com

Source: NW24-123