September 2024
PVPC-LW pumps with constant power, the FASTEST DELIVERY TIME in the market!
The delivery time for PVPC-LW axial piston pumps is now 6/8 weeks! The delivery time of mechanical pumps with constant power control was 12/14 weeks, since each pump must be calibrated according to the characteristics of the customer electrical motor.
The halving of the delivery times is the result of a long production process optimization, further improving Atos' lean manufacturing plan.
A further step forward to the industrial revolution that is re-shaping Atos into a next-generation SMART FACTORY in less than two years!
Discover PVPC pumps at www.atos.com